UPGRADATION OF ALLAMA IQBAL INTERNATIONAL AIRPORT (AIIAP) LAHORE

The work comprises design of Internal Illumination system of Airport buildings, Street and perimeter lighting, Data and Communication network, External and internal LT and HT cables, Communication cables, Fiber Optics Cable network with NMS, Telephone network, Fire alarm system, MATV system, L.T. and H.T.  Switchgear, Transformers,

HVAC system, Building Management System, Passenger Boarding Bridges, Aircraft  Power Supply, and Aircraft Visual Guidance Docking System, captive power House based on 2000 KVA generators sets, Navigational Equipment, Firefighting, Plumbing and Utilities.

Complete Car parking lighting system and power system.

Complete Navigation system including Air Traffic Control System, Wireless Communication System, Flight Information Display System, and Air Weather Observatory System.

Complete HVAC and Mechanical design Engineering, Public Health Engineering works on Terminal Building and Land Side of the project.

The job is being completed in association with Asian Consulting Engineers and Typsa (SPAIN) & Architects Group of Spain.